Planning for the canal crossing dates back to at least the beginning of the 20th century. Work on the Mittellandkanal began in 1905, while work on the overall project continued until 1942, when all construction was brought to a halt because of World War II. After the war, the government of East Germany did not resume work on the project because east-west trade was no longer important in the context of the Cold War. After the reunification of Germany, the reestablishment of major water transport routes made the water bridge a priority again. Work started in 1998, with construction taking six years and costing €501 million. The water bridge now connects Berlin’s inland harbour network with the ports along the Rhine River. The aqueduct's tough structure incorporates 24,000 tonnes of steel and 68,000 cubic meters of concrete. Source: Wikipedia